Skip navigation

Owls Hall

Package Pump Enquiry

Please complete the following form in order for our pump team to size a pump station for your application.

Contact Details
Name
Company
Street Address
Town/City
County
Postcode
Telephone (no spaces, inc. area code)
Email
Site Details
Click here if the site details are the same as above
Name
Company
Street Address
Town/City
County
Postcode
Telephone (no spaces, inc. area code)
Email
Site Information
Pumping distance (A) metres Typical Installation
Pumping Lift (B) metres
Discharge Height (C)
(if different to Lift)
metres
Proposed inlet depth (D) metres
Inlet size 110mm    160mm
Type of application
i.e. 1 house, 2 houses, pub, etc.
Number of users
Material application Sewage    Surface Water    Effluent
Power supply Single    Three Phase
New lay or existing rising main New    Existing
If existing, size of rising main
Pumping to
i.e. public/private sewer, treatment plant, etc.
Cover duty pedestrian cover supplied as standard
24 Hours storage required Yes    No   (Minimum 24 hour storage is a legal requirement for foul sewage)
Any other information